- Overview
- Certifications
- Company Profile
- Production process
- Packaging & Shipping
- Our Advantages
- More option
- FAQ
Basic Info.
Product Description
Item No. | OC-014 |
Size(mm) | 500*550*650 |
Carton | 1pc/1ctn |
Material | Fabric+Metal |
MOQ | 200pcs |
Feature | Modern |
Usage Scenarios | Home |
Delivery time | Trial order lead time:10-15days. |
Formal order lead time:15-25days. | |
Payment terms | T/T or L/C, 30% deposit before production, the balance should be paid before delivery |
Loading port | Tianjin,China |
1)Usual packed in 2pcs/1ctn; 4pcs/1ctns; 6pcs/2ctns
2)Frame Package: with styrofoam paper; Hardwares in poly bags;
3)Carton: 5-layer cardboard carton
Export standard packing for loading container, no any damage happened.
1) Glass Package: Styrofoam Paper&foam sheet.
2) Frame Package: Legs wrapped with styrofoam paper, Hardwares in poly bags.
3) Carton: 5-layer cardboard carton following Stacking Test and Master Carton Drop Test
- Low MOQ, we can accommodate your quantity, even if it is small.
- OEM accepted, products can be made based on your requirements.3.
- Good quality, we have very strict quality control.
- Best price, we will give you the most competitive price.
- Accurate delivery time, we will make sure the goods are delivered to you on time.
- Good service, quick response, try our best to help.
1.How about your quality?
We have QC department, they control every process,
start from purchasing raw material to finish the goods and loading the container.
2. What is your MOQ?
Usually 200 pcs per model for chairs and 50 pcs per model for tables .
3. Will you pack the goods with assembly instruction?
Yes, we put the assembly instruction into the package.
If you still don't know how to assemble, you may consult us.
4. If we want a sample, how much do we need to pay?
We usually charge 2 times price, and the transport fee should be paid by buyer,
we will return the extra money when you place order.
5. What about the leading time for mass production?
It depends on the order quantity and the product.
Usually our leading time is 20-30 days after order confirmed.
If you have any interest, please feel free to contact us. Thank you.